BITMAIN Antminer S19 XP Hyd (255Th)
Model BITMAIN Antminer S19 XP Hyd (255Th) from Bitmain mining algorithm SHA-256 with a maximum hashrate of 255Th for a power consumption of 5304w.
Profitability
Period | /Day | /Month |
---|---|---|
Income | $16.44 | $493.20 |
Cost $0.1/kWh |
$12.70 | $381.00 |
Profitability | $3.74 | $112.20 |
Algorithms
Algorithm | Efficiency | Profit |
---|---|---|
SHA-256
255Th - 5304.0W |
0.05J | $3.71 |
Specification
Mining pools for BITMAIN Antminer S19 XP Hyd (255Th)
Pool | Start Mining |
---|---|
Nicehash | nicehash.com |
Mining Rig Rental | miningrigrental.com |
zpool | zpool.ca |
XmrPool | xmrpool.net |
Zergpool | zergpool.com |
XmrPool Hub | xmrpoolhub.com |
Mining Pool Hub | miningpoolhub.com |
Carbon Footprint
Estimating the carbon footprint from the cryptocurrency mining operations of the BITMAIN Antminer S19 XP Hyd (255Th) in a year, based on energy consumption and various energy sources
Energy Source | Carbon Intensity (gCO2e/kWh) | Yearly Power Consumption (kWh) | Yearly Carbon Footprint (kgCO2e/year) |
---|---|---|---|
Wind | 504 | ||
Nuclear | 549 | ||
Hydroelectric | 1,099 | ||
Geothermal | 1,741 | ||
Solar | 2,062 | ||
Biofuels | 10,539 | ||
Gas | 22,454 | ||
Coal | 37,577 |
Warning: The numbers provided above are merely an estimate of the carbon footprint resulting from cryptocurrency mining. They are presented for informational purposes and should be seen as references only, not as an absolute exact figure. The actual carbon emissions can vary based on many different factors such as the approach, calculation methods, and specific parameters of each mining technology type. We recommend users to consider these figures as a small part of a larger environmental picture and the impact of cryptocurrency mining on it.