Bombax Miner EZ100-C — Profitability Simulator
Bombax Miner EZ100-C loses up to $0.32 a day, best on Etchash mining at 3.8 Gh/s. Also available: Etchash hashpower sale ($-0.37/day). Pulling 760 W from the wall — at $0.10/kWh, not quite breaking even at today's rates.
Tap to switch · 7 sections Profitability Simulator 4/7
| Rigs × Qty | Share | Rev /rig/day | Cost /rig/day | Profit /rig/day | Total profit /day |
|---|---|---|---|---|---|
| — | — | — | — | — | — |
Tap to switch · 7 sections Profitability Simulator 4/7
| Rigs × Qty | Share | Rev /rig/day | Cost /rig/day | Profit /rig/day | Total profit /day |
|---|---|---|---|---|---|
| — | — | — | — | — | — |