free web
        stats
M
MiningBoard Pro
XELISHASHV3 $0.0143/KH/d TARIRANDOMX $0.0128/KH/d QHASH $0.0002/MH/d DYNEXSOLVE $0.0113/KH/d ABELHASH $0.0000/MH/d MEOWPOW $0.0061/MH/d KARLSENHASHV2 $2.9991/GH/d VERSAHASH $0.0150/MH/d FISHHASH $0.0000/MH/d KADENA $0.0192/TH/d IRONFISH $0.0002/GH/d ETHASH $0.0023/MH/d XELISHASHV3 $0.0143/KH/d TARIRANDOMX $0.0128/KH/d QHASH $0.0002/MH/d DYNEXSOLVE $0.0113/KH/d ABELHASH $0.0000/MH/d MEOWPOW $0.0061/MH/d KARLSENHASHV2 $2.9991/GH/d VERSAHASH $0.0150/MH/d FISHHASH $0.0000/MH/d KADENA $0.0192/TH/d IRONFISH $0.0002/GH/d ETHASH $0.0023/MH/d
MicroBT · ASIC · Sha256

MicroBT Whatsminer M50S++ — ROI calculator

Profit /day
$2.11
Income /day
$10.56
0.00007767 BTC/day
Cost $8.45 @ $0.1/kWh
Hashrate
160Th/s
Sha256
Power · Efficiency
3520.0W
22.00 j/Th

MicroBT Whatsminer M50S++ loses $2.35 a day mining Sha256 at 160 Th/s and pulling 3520.0 W from the wall. That's after subtracting power at $0.1/kWh — not quite breaking even at today's rates.

4 minutes ago Similar miners ↓

How long until the MicroBT Whatsminer M50S++ pays for itself? The calculator below combines your hardware cost, electricity rate ($0.1/kWh by default) and the rig's best income source today to project payback months and break-even electricity.

ROI calculator

ROI calculator for MicroBT Whatsminer M50S++

Model payback, electricity, and first-year return for this rig.

Hardware cost $5,000
Electricity rate $0.10/kWh
Runtime per day 24
Pool fee 2.0%
Difficulty growth /yr +0%
Net profit /day
$0.00
after electricity & fees
Payback period
First-year return
$0
Projected cumulative profit

The line crosses $0 on the day you break even. Everything above is pure profit.

Days since purchase Cumulative profit
Monthly P&L · 3-year horizon
Capital cost is booked in month 1. Cumulative columns include the rig purchase, so Net goes positive at true breakeven.
Month Earned (mo) Cost burned (mo) Cumulative earned Cumulative cost Net % ROI
Frequently asked

About the MicroBT Whatsminer M50S++

Is the MicroBT Whatsminer M50S++ profitable?

As of May 2026, the MicroBT Whatsminer M50S++ earns $-2.35/day mining Sha256 at an electricity cost of $0.1/kWh. At this electricity rate it is not profitable.

What is the payback period for the MicroBT Whatsminer M50S++?

Payback equals hardware cost divided by daily profit. The ROI calculator on this page projects payback months for the MicroBT Whatsminer M50S++ at $0.1/kWh — adjust the electricity rate and the hardware cost to match your scenario. Most miners aim for 12–24 month payback on new hardware.

What's the break-even electricity rate for the MicroBT Whatsminer M50S++?

Break-even electricity is the rate above which the MicroBT Whatsminer M50S++ stops being profitable. The calculator below derives it from the rig's revenue and power draw — anything below this rate yields positive daily profit, anything above turns the rig into a net loss.