free web
        stats
M
MiningBoard Pro
XELISHASHV3 $0.0157/KH/d TARIRANDOMX $0.0537/KH/d QHASH $0.0001/MH/d DYNEXSOLVE $0.0150/KH/d ABELHASH $0.0001/MH/d MEOWPOW $0.0080/MH/d KARLSENHASHV2 $4.2977/GH/d VERSAHASH $0.0150/MH/d FISHHASH $0.1053/MH/d KADENA $0.0188/TH/d ETHASH $0.0026/MH/d BLAKE3 $0.0002/GH/d XELISHASHV3 $0.0157/KH/d TARIRANDOMX $0.0537/KH/d QHASH $0.0001/MH/d DYNEXSOLVE $0.0150/KH/d ABELHASH $0.0001/MH/d MEOWPOW $0.0080/MH/d KARLSENHASHV2 $4.2977/GH/d VERSAHASH $0.0150/MH/d FISHHASH $0.1053/MH/d KADENA $0.0188/TH/d ETHASH $0.0026/MH/d BLAKE3 $0.0002/GH/d
Bitmain · ASIC · Sha256 · RELEASED JAN 2023

Bitmain S21 Hyd — ROI calculator

Profit /day
$5.40
Income /day
$18.26
0.00015815 BTC/day
Cost $12.86 @ $0.1/kWh
Hashrate
335Th/s
Sha256
Power · Efficiency
5360.0W
16.00 j/Th

Bitmain S21 Hyd makes up to $5.40 a day, best on Sha256 hashpower sale. Also available: mining Sha256 at 335 Th/s ($-0.48/day). Pulling 5,360 W from the wall — at $0.10/kWh, profitable at today's rates.

28 minutes ago Similar miners ↓
Tap to switch · 7 sections ROI calculator 6/7
ROI calculator

ROI calculator for Bitmain S21 Hyd

Model payback, electricity, and first-year return for this rig.

Hardware cost $5,000
Electricity rate $0.10/kWh
Runtime per day 24
Pool fee 2.0%
Difficulty growth /yr +0%
Net profit /day
$0.00
after electricity & fees
Payback period
First-year return
$0
Projected cumulative profit

The line crosses $0 on the day you break even. Everything above is pure profit.

Days since purchase Cumulative profit
Monthly P&L · 3-year horizon
Capital cost is booked in month 1. Cumulative columns include the rig purchase, so Net goes positive at true breakeven.
Month Earned (mo) Cost burned (mo) Cumulative earned Cumulative cost Net % ROI
Frequently asked

About the Bitmain S21 Hyd

Is the Bitmain S21 Hyd profitable?

As of May 2026, the Bitmain S21 Hyd earns $-0.48/day mining Sha256 at an electricity cost of $0.1/kWh. At this electricity rate it is not profitable.

What is the payback period for the Bitmain S21 Hyd?

Payback equals hardware cost divided by daily profit. The ROI calculator on this page projects payback months for the Bitmain S21 Hyd at $0.1/kWh — adjust the electricity rate and the hardware cost to match your scenario. Most miners aim for 12–24 month payback on new hardware.

What's the break-even electricity rate for the Bitmain S21 Hyd?

Break-even electricity is the rate above which the Bitmain S21 Hyd stops being profitable. The calculator below derives it from the rig's revenue and power draw — anything below this rate yields positive daily profit, anything above turns the rig into a net loss.